Moving In: Installation
June 29, 2020
Ellen is getting ready for the next phase of installation! So much prep work to get all of the plywood backing cut and ceramic drilled for the heavier sections of the mural. Exciting days ahead!
Moving In: Installation
June 29, 2020
Ellen is getting ready for the next phase of installation! So much prep work to get all of the plywood backing cut and ceramic drilled for the heavier sections of the mural. Exciting days ahead!
90 Whiting Street • PO Box 538 • Winsted, CT 06098
(860) 379-3006