Digging In: Construction
March 25, 2022
And the railings on the third level are finished, too! We can't wait for everyone to get inside and see the mural from all three levels beginning in June.
Digging In: Construction
March 25, 2022
And the railings on the third level are finished, too! We can't wait for everyone to get inside and see the mural from all three levels beginning in June.
90 Whiting Street • PO Box 538 • Winsted, CT 06098
(860) 379-3006