Moving In: Installation
July 30, 2020
Another tricky install, this time with about 300 lbs. of marble that John and Cory held while Don drilled the plate to secure it. And the jib sail is up!
Moving In: Installation
July 30, 2020
Another tricky install, this time with about 300 lbs. of marble that John and Cory held while Don drilled the plate to secure it. And the jib sail is up!
90 Whiting Street • PO Box 538 • Winsted, CT 06098
(860) 379-3006